Updated:

This project will consist of Phase 1 of two two-story buildings and Phase 2 of two two-story buildings with a total NRA of 164,100 SQM.

Located in the Chongqing Western New City, the project is only 15 kilometers to downtown Chongqing via the Chengdu-Chongqing Ring Expressway (G93). Next to the G93, it is advantageously situated to serve Chengdu-Chongqing intercity distribution. The project is only 2 kilometers from the Chongqing-Europe Railway departure station connecting Chongqing with Asia-Pacific and Europe.

Key Features
  • This site is located in the Chongqing Western New City, the project is only 15 kilometers to downtown Chongqing via the Chengdu-Chongqing Ring Expressway (G93).
  • Next to the G93, it is advantageously situated to serve Chengdu-Chongqing intercity distribution.
  • The project is only 2 kilometers from the Chongqing-Europe Railway departure station connecting Chongqing with Asia-Pacific and Europe.

  • Prologis Chongqing West Logistics Center Ph1 B2
    Min Space Available 40386.153 SF 3752 SQM 1134.98 tsu
    Max Space Available 445916.085 SF 41427 SQM 12531.668 tsu
    Total Available 40386.153 - 445916.085 SF 3752 - 41427 SQM 1134.98 - 12531.668 tsu
    # Grade Level Doors 20
    Warehouse Lighting Type T5/T8 Fluorescent
    Clear Height 32.81 Feet 10 Meters 10 Meters
    Main Breaker Size N/A
    Fire Suppression System ESFR
    Number of Dock High Doors 10